[ Read Responses | Post a New Response | Return to the Index ] Posted by Flatbush41 on Wed Jun 18 12:00:23 2003, in response to Re: Flushing Line to B Division?, Even though the cost/benefit of this is not totally insane, it's still rather high, and will probably never happen. But it would add capacity. Heck maybe the SAS southern half can be designed so that A and B div can run together (yeah, right). But better than widening the Steinway tubes, right? (There are no responses to this message.) Replying to posts on SubTalk are disabled at this time. |