www.nycsubway.org

Re: Flushing Line to B Division? (514056)

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

Posted by AlM on Tue Jun 17 18:47:15 2003, in response to Flushing Line to B Division?,
posted by oakapple on Tue Jun 17 12:19:29 2003.

Just to second what you say:

- Converting to B division is a 19% increase in capacity (over the current 11 car trains) and requires widening the Steinway tube or some other major reroute.

- Lengthening all platforms to 12 A division cars is a 9% increase in capacity and is far simpler than widening the Steinway tube.

- Increase tph from 28 to 36 once CBTC is fully installed and tested is a 29% increase in capacity, and can be done in addition to either of the above.

The 2nd and 3rd capacity increases provide a lot more bang for the buck, and a lot less disruption, than the first.


(There are no responses to this message.)

Replying to posts on SubTalk are disabled at this time.