[ Read Responses | Post a New Response | Return to the Index ] Posted by Steve B-8AVEXP on Mon Jun 16 20:52:58 2003, in response to Re: Broadway Junction on the IND: UPDATE, The Flushing line itself was built to Dual Contracts dimensions. All you'd have to do is shave back the platforms and perhaps move the signals a skosh. The Steinway tubes are another story. Responses
Replying to posts on SubTalk are disabled at this time. |