www.nycsubway.org

Re: WJ&S/PRSL electrification (163745)

[ Read Responses | Post a New Response | Return to the Index ]
[ First in Thread ]

Posted by Jersey Mike on Sat Oct 28 14:50:42 2000, in response to Re: WJ&S/PRSL electrification,
posted by chuchubob on Sat Oct 28 10:56:03 2000.

Troley wire was first installed on the Vineland-Millville portion, but then replaced by 3rd rail a few years later. At first the 3rd rail wasn't even covered w/ a wooden guard, but after some electricutions (the newspapers called the 3rd rail a menace) the WJ&S installed fencing, warning signs and a wooden cover. Around populated areas the cover covered the top, rear and lower front of the 3rd rail with only a 4-6 inch slit for the shoe to slide along. Also in By Rail there is a picture of a motorman standing astride of an uncovered 3rd rail. Its right accross from the little blurb about the cutt-off that wasn't.


(There are no responses to this message.)

Replying to posts on SubTalk are disabled at this time.